Underground Utility - State
  • Seminar Dates (click to view updated schedule)
    • Part 1: Business & Financial
    • Part 2: Technical
  • Overview of Exam Prep Programs for Underground Utility
  • ORDER Books Only
    • Underground Utility Books Only (Complete Set)
      • CES student $557.78 Call 1-800-277-8877
      • Non CES student $619.75 Order Online Now
  • ORDER Courses Only
    • Underground Utility Contractor Complete Course
    • Underground Utility Contractor Part 1 Only
      • $795 includes $100 deposit Call 1-800-277-8877
    • Underground Utility Contractor Part 2 Only
      • $795 includes $100 deposit Call 1-800-277-8877
  • ORDER Courses & Books
    • Underground Utility Complete Course and Books
      • $1,552.78 includes $100 deposit Call 1-800-277-8877
  • State Exam Test Dates
 ELIGIBILITY REQUIREMENTS AND SCOPE OF WORK

Qualifications:
Experience must be in the construction, installation and repair on public or private property of main sanitary sewer collection systems, main waters distribution systems, and storm sewer collection systems.

 

Scope of Work:
An "underground utility and excavation contractor" means a contractor whose services are limited to the construction, installation, and repair of:

  • main sanitary sewer collection systems;

  • main water distribution systems;

  • storm sewer collection systems;

  • the continuation of utility lines from the main systems to a point of termination up to and including the meter location for the individual occupancy, sewer collection systems at property line on residential or single-occupancy commercial properties, or on multi-occupancy properties at manhole or wye lateral extended to an invert elevation as engineered to accommodate future building sewers, water distribution systems, or storm sewer collection systems at storm sewer structures; and

  • install empty underground conduits in rights-of-way, easements, platted rights-of-way in new site development, and sleeves for parking lot crossings no smaller than 2 inches in diameter, provided that each conduit system installed is designed by a licensed professional engineer or an authorized employee of a municipality, county, or public utility and that the installation of any such conduit does not include installation of any conductor wiring or connection to an energized electrical system.

  • An underground utility and excavation contractor shall not install any piping that is an integral part of a fire protection system as defined in s. 633.021 beginning at the point where the piping is used exclusively for such system.

If you have questions and want to speak to a counselor, please call us at 1-800-277-8877


Home  |  About Us  | Information  |  County Exam Prep  |  State Exam Application
State Exam Prep  |  State Electrical Prep  |  Continuing Education  Bookstore
Office Locations  | 
What Our Students SayRequest Information